Sunday, May 21, 2017

Flybridge Removal!!!


We removed the flybridge! Shawn had prepared the flybridge for removal by screwing a board across the seats of the flybridge to stabilize the bridge wings and ease the removal.  Charlie came with the travel lift (with beam attached) and easily lifted off the flybridge and placed it in front of the Yellow Bird.  (Shawn and Charlie did stellar job of finding the “balance spot” for the beam and the flybridge).






















We removed the swim platform and brackets in order to (1) brace the swim platform by placing backing plates on the inside of the hull (we found all the underwater screws were deteriorated and need to be replaced) and (2) sand and clean the teak. 

We began polishing (which is going to require LOTS of elbow grease--sadly they don’t sell that at Jett’s Marine where we purchased our supplies!).  We continued to remove stripes, a frustrating and tedious task…not my favorite part of this refurbishment!

We wet-sanded the painted stripes to prepare for repainting. Removing the tape stripes is by far the most frustrating task . Because they are taped (3 layers) and painted over the tape, it is coming off in tiny sections in many areas. I am using a razor scraper and sometimes I can get a good run of tape coming off,  For some of the tougher spots, I tried spraying an adhesive remover on the tape first, but I am not sure it is making it any easier. We thought this part would be a quick “between bigger tasks” but it is becoming a big task in and of itself.  



Sunday, May 7, 2017

The prep continues....


The prep works continues…Yesterday, we removed the flybridge rails, and the mast. I like her better with no mast, so I think we will “simply” plug the hole and rerun the wires for the anchor and the steaming lights. We lifted the flybridge and chocked it with scrap 2*4 blocks so that it is ready to be removed from the deck. 


Today we removed the remainder of the letters. I have to confess I did go after work one day to do that, but was only able to remove one letter in 15 minutes, so I got grumpy and left! However with both of us working (and the sun shining on the letters) we made quick work of it. We discovered some of the stripes on the side were tape with paint over it in parts, so we began to remove that also. Our plan is to paint her while she is out of the water. I don’t think we are going to have her ready by Memorial Day!












Sunday, April 30, 2017

Prep Work Begins


Today, we began preparations in earnest for the MAIN EVENT (recoring the flybridge). Shawn disconnected all the wires (yep, the ones we replaced in November) from the flybridge panel. AND the new steering line. I was responsible for pulling them all the way back to the flybridge wings. And untangling them and coiling them! This is my first rodeo doing all of this, so I am an inordinately proud of the smallest accomplishments! I also unbolted all the flybridge rails and the flybridge ladder.








Then we began to brace the floor of the flybridge with 2*4 so that we can walk on it while we recore.  A side effect of the bracing was the water that began to steadily drip from the floor through the ceiling as the bracing squeezed the accumulated water from the sodden core.



I began to remove the letters from the transom. They came off pretty easily due to the heat of the sun, so I decided that was something I could do after work one day. We stowed our stuff and left our girl safely ensconced in the boatyard.



Saturday, April 22, 2017

to the railway...and beyond!!!

The day is finally upon us! We checked with the boatyard this morning and they have a spot for us! Even though today is drizzly and grey and the wind is blowing some, we determined we could take our YellowBird up the Bay a couple of miles to Cockrell's Creek to Jennings Boatyard.

We left about 3 in the afternoon and the water was a bit rough at times with low visibility, but Shawn ensured that we arrived safely at our destination! I even got to drive a bit....with autopilot!! :)







And now our weekends and any free time will find us at the boatyard working on our projects!  The dock looks very empty without our YellowBird there!

Sunday, April 16, 2017

Spring Repairs Begin

Now that the warmer weather is here, it is time for us to begin our repairs in earnest! We have a mental deadline so that we can FINALLY have boating time together this summer...what we have been waiting for!

In March, we removed the lifelines and stancheons. We could see that the underneath the backing plates was green and funky from improper sealant, so we scrubbed and temporarily sealed the holes with silicone. We will devise a more permanent seal solution after we fiberglass the flybridge.









We also (well....Shawn) put in a second bilge pump just in case we need it!




And now to wait for an opening in the boatyard (railway)!