Today, we began preparations in earnest for the MAIN EVENT (recoring
the flybridge). Shawn disconnected all the wires (yep, the ones we replaced in
November) from the flybridge panel. AND the new steering line. I was
responsible for pulling them all the way back to the flybridge wings. And
untangling them and coiling them! This is my first rodeo doing all of this, so
I am an inordinately proud of the smallest accomplishments! I also unbolted all
the flybridge rails and the flybridge ladder.
Then we began to brace the floor
of the flybridge with 2*4 so that we can walk on it while we recore. A side effect of the bracing was the water
that began to steadily drip from the floor through the ceiling as the bracing
squeezed the accumulated water from the sodden core.