Monday, July 10, 2017

the end is in sight???



July 8, 2017

Shawn’s birthday! We had a couple of hours to spend before we had a social obligation, so we headed to the boatyard to prepare for the “big” work tomorrow.  We removed some remaining coring debris from UNDER the flybridge perimeter. I swear I think the dust and debris reproduces itself while we are gone. We continually find more to remove after it is “clean”. AND sometimes I think we spend as much time to uncovering and recovering her as we do actually working on her on these short bursts of work. But each little bit of time we spend on her adds up and the end goal is in sight. We swept and vacuumed (and spent 30 minutes uncovering and recovering her!).



July 9, 2017

A huge workday! Shawn inspired me by taking me for an early morning boat ride on the skiff while we drank coffee and admired the wildlife and sunrise from our Carolina Skiff. 







We headed to the YB about 9, armed with a case of water and a few gatorades. After uncovering her AND cleaning more debris(#%^*!) we began to measure in order to cut the plywood and the coring for the flybridge. I am actually quite impressed with our work! It looks very professional. All due to Shawn. First we had to determine where we needed plywood and where we needed nidacore for the coring (I advocated for plywood over the whole flybridge because I figured it would be easier and stronger).  Apparently the way it works is: if something has to be “through-bolted” (whatever the heck that is!) or fastened somehow then we need plywood there. Otherwise we use nidacore---it is lighter, strong and less expensive. So…everywhere we have to “anchor” the helm, the helm chair, the seats, the mast and the railings needs plywood. Everything else nidacore. The first thing we did was fitted around the forward perimeter of the flybridge with nidacore because no fasteners are used there. We measured and calculated, cut and fit. And it worked! YAY!!! The flybridge deck is 88” wide and the first section we needed is 30” depth. Plywood. Once we cut it, we had to “score” the plywood so that it will flex and bend. So I made 3” lines on the plywood across the sheet and Shawn set the blade to ½” (it is ¾” plywood) and we scored the plywood section. It worked amazingly perfectly. These scores will be filled with epoxy once the laminating process begins. As we worked our way towards the rear of the flybridge, we alternated plywood and nidacore as needed. Hot, sweaty work. Several times we were ready to call it a day, but we pressed on until we got to a the very rear portion which requires us to measure and cut and fit under the rear perimeter. Too much thinking for the end of a day in the heat!!!









  







 So for the entire day, section by section, working from the front of the flybridge to the back, we would measure, then descend to cut the wood and score it. I would ascend, Shawn would hand me the plywood and I would hold it while he ascended and then we would place it on the flybridge floor. I guess you could do it with one person, but two makes it more manageable.





One logistical item I have failed to mention. Each day when we arrive at the boat yard, we have to connect to the power and to the water. At the end of the workday, we disconnect the water and power and wind up the electrical cord and hose.  And "our" boatyard looks like a ghost town now! We are one of the few remaining who are not YET launched into the glorious water!





Sunday, July 2, 2017

Summer is half-over





July 2

Tired and frustrated. I love seeing the progress on the YellowBird, AND at the same time, I am so tired just bone-tired of working on her. I want to go to the beach and feel the sand on my feet and the sun on my face. I want to walk and listen to the waves. 




And she is not ready. I feel as if she will never be ready and that I will never have the chance to enjoy the fruits of all this labor. Logically I know that it is better to fix everything that needs to be fixed now while she is in the boatyard. And I do not mind the labor, but sometimes it seems never-ending... this labor of love on the YellowBird. I am a sand and sea girl. I am looking forward to the day (next year????) when I can sit in the cockpit while anchored offshore and sip an adult beverage. I want to enjoy sunsets and dancing on the flybridge. I feel as if I am never going to get there.

So this weekend, we (meaning Shawn) replaced the rotten supports underneath the door frame. We knew it had to be done before we recore the flybridge so this was the weekend. 

We braced and supported the sandwiched crossbeams that Shawn replaced previously. And by we I mean Shawn. I was the “gopher” for him.

He added additional supports from the stringers to the 2*4s that we sandwiched under the door support. Hot…boring…poor Shawn since he was underneath the cockpit in the storage spot all morning. We put a fan under there, but it was hot and muggy work for him.








So now the cockpit is ready for the door to be returned. Oh dang! That means I have to finish painting the door frame. It needs another pass with the spray paint. Hmmm...maybe we will just go for an "open" look and not replace the door. :)




I thought the flybridge was ready for recoring….NOT! Apparently we have to sand it smooth. Well, duh. It is logical, but it was so disheartening to realize that I wasn’t finished with the flybridge preparation. I thought I had it completed! Nope…it is neverending. My amazing Shawn actually did all the sanding (hmmmm….I  think he really does not trust me with powertools!) and I swept up all the ensuing debris. Yuck. I felt like I had dust in my lungs for hours afterwards!





Our pile of debris grows larger and larger. It is absolutely mind-boggling how much "stuff" we remove. Wood, epoxy chunks, unidentifiable material chunks. If the YellowBird were a person, she would be the equivalent of the "bionic woman" by the time we finish her! (Who else remembers watching the "Six Million Dollar Man" and the "Bionic Woman"?). And I wonder if I can put this experience on my resume and acquire work in a boatyard.



AND our materials for the recoring arrived! I have no idea of what is in the huge buckets...some sort of "goop" that we will use to "mud" the flooring. But it is so exciting to see the new clean materials and KNOW that we are going to have a sturdy flybridge floor...so I will get my dancing UNDER the stars!

Friday, June 30, 2017

More bits and pieces

We took a bit of a break from working on the Yellowbird to visit San Antonio for the AFBMT graduation of one of our sons. We loved San Antonio with its heat but low humidity! But no where to use our trawler!



June 21

First official day of summer vacation (for me) and we worked on the Yellow Bird!  We removed the top of the fiberglass pocket at sliding door threshold. Shawn cut the bulkhead that held rotting 2*4 that was supporting the sliding door frame. We cleaned out the all the rotten wood.












June 24

We spent all day working on the door frame floor support. Shawn removed the bad section of floor support on the aft and port side of saloon door.







He then replaced the aft saloon floor support. He then sandwiched salt treated lumber and stainless steel bolts, the door frame support (by sandwiching salt treated 2*4 and stainless steel bolts into the existing pocket).

June 28
I am out of town visiting my kiddos in South Carolina. Shawn continues to plug away on the small things that need to be done (and which do not require my help!). He sanded and oiled the teak trim on the cockpit. It looks great! So…I think we are going to paint the cockpit? Before we put her over? Maybe after we put her over. I think that will be a GREAT fall project so we can have a few weeks of enjoyment.